ropeCreate TKOH: Difference between revisions
Jump to navigation
Jump to search
mNo edit summary |
m (Text replacement - "Category:Command Group: Ropes and Sling Loading" to "") |
||
Line 54: | Line 54: | ||
[[Category:Scripting Commands Take On Helicopters|{{uc:{{PAGENAME}}}}]] | [[Category:Scripting Commands Take On Helicopters|{{uc:{{PAGENAME}}}}]] | ||
[[Category:Take_On_Helicopters:_New_Scripting_Commands_List|{{uc:{{PAGENAME}}}}]] | [[Category:Take_On_Helicopters:_New_Scripting_Commands_List|{{uc:{{PAGENAME}}}}]] | ||
<!-- CONTINUE Notes --> | <!-- CONTINUE Notes --> | ||
<!-- DISCONTINUE Notes --> | <!-- DISCONTINUE Notes --> |
Revision as of 16:09, 17 September 2020
Description
- Description:
- Creates a rope. For Arma 3 syntax see ropeCreate.
- Groups:
- Ropes and Sling Loading
Syntax
- Syntax:
- ropeCreate [fromObject, fromPoint, toObject, toPoint, segments, length]
- Parameters:
- [fromObject, fromPoint, toObject, toPoint, segments, length]: Array
- fromObject: Object - object where rope starts and which fly behavior will be affected
- fromPoint: Array or String - specifies where on the object the rope should start, either a string (name of memory point) or an array of three numbers (vector in model coordinates).
- toObject: Object - object which is automatically attached to other side of rope (can be objNull, rope will stay with free end)
- toPoint: Array or String - specifies where on the object the rope should finish, either a string (name of memory point) or an array of three numbers (vector in model coordinates)
- segments: Number - define number of segments to be created
- length (Optional): Number - optional, rope length in meters
- Return Value:
- Object
Alternative Syntax
- Syntax:
- ropeCreate [fromObject, fromPoint, length, segments, unroll]
- Parameters:
- [fromObject, fromPoint, lenght, segments, unroll]: Array
- fromObject: Object - object where rope starts and which fly behavior will be affected
- fromPoint: Array or String - specifies where on the object the rope should start, either a string (name of memory point) or an array of three numbers (vector in model coordinates)
- length (Optional): Number - rope length
- segments (Optional): Number - define number of rope segments
- unroll (Optional): Boolean - true if rope starts at one place and falls down unrolling itself, false to create it already in full length (default: false) (not used in A3)
- Return Value:
- Object
Examples
- Example 1:
myRope = ropeCreate [vehicle player, "fastrope0", 10, 10, true];
Additional Information
- See also:
- ropeDestroyropeDetachropeSetCargoMass
Notes
-
Report bugs on the Feedback Tracker and/or discuss them on the Arma Discord or on the Forums.
Only post proven facts here! Add Note
Notes
Bottom Section